Catchment Management Plan, Flat Bush

Catchment Management Plan, Flat Bush 2017-05-24T11:17:53+00:00

Project Description

The Integrated Catchment Management Plan (ICMP) for Flat Bush was prepared at a high level without an understanding of how individual land holdings would be developed.

During detailed design of various land holdings it was identified by John Gardiner, while working for another consultancy, that significant cost savings could be achieved for land owners, Council and ultimately ratepayers.

Relocation of various treatment devices was successfully negotiated with Council and other stake holders to deliver the savings without the need for re notifying of the ICMP.

The experience our staff possess contributed to –

  • Reduced land areas required to be purchased by Council reducing cost for ratepayers.
  • Long term reduction in reserve maintenance costs for the benefit of ratepayers.
  • A high level of stormwater treatment coupled with strong amenity for the community.

Delivered through –

  • Our ability to challenge assumptions and the confidence to do what delivers effective results, not necessarily what is asked.
  • The ability to question prior assumptions and think outside the box.
  • Technical Knowledge in stormwater matters.
  • Strong commercial knowledge
  • Good negotiation skills.

Similar Projects

2017-05-24T10:50:08+00:00

Summerset, Hingaia

, ,

Candor³ were engaged by a consultant to Summerset to resolve issues with treatment and disposal of stormwater from this proposed retirement village after several attempts to solve the problem  with Council had failed. Our team investigated the issues and rapidly developed a cost effective solution that was acceptable to Council. The experience our staff possess contributed [...]

2017-05-24T11:17:21+00:00

Stonefields Stormwater Treatment, Mount Wellington, Auckland

The Stonefields residential development lies within an old quarry basin with no option for gravity discharge of stormwater. Without proper consideration untreated stormwater runoff would put thousands of homes at risk of flooding and result in unsightly ponding and sedimentation at low points. Mark Sollner, while working for another consultancy, designed a system of rock [...]

2017-05-24T11:17:53+00:00

Catchment Management Plan, Flat Bush

The Integrated Catchment Management Plan (ICMP) for Flat Bush was prepared at a high level without an understanding of how individual land holdings would be developed. During detailed design of various land holdings it was identified by John Gardiner, while working for another consultancy, that significant cost savings could be achieved for land owners, Council and ultimately [...]