246 Victoria Street West, Pukekohe

, ,

This successful 75 lot subdivision in Pukekohe is now complete with houses under construction. The original structure plan schemes for the block delivered approximately 69 lots. With Council’s agreement modifications to the planned structure plan roads delivered an additional 6 lots. Candor³ completed all engineering design and observation together with surveying works and compliance through [...]

178 Point View Drive, East Tamaki Heights

, ,

Intersection Properties successfully had this property approved as an SHA after significant work to convince Council that with controlled landscape amenity a development could adequately deal with a visually sensitive ridgeline dominating the property. Initial schemes prepared as a part of the SHA process did not manage the steep contour well and Candor³'s first involvement [...]

130 Hobsonville Rd, Hobsonville

Candor³ carried out the engineering design and observation work for this integrated development in Hobsonville. Working with A Studio architects an efficient scheme was developed yielding 59 lots on the 2.0ha site.   Similar Projects

200 Hingaia Rd, Hingaia

,

Comprising 44 residential sections and a further 1.0ha set aside for a future integrated development this site lies on the shores of the upper Manukau Harbour in Karaka. The zoning of the land which was driven by Candor³ on behalf of the KARLA group of landowners was achieved through the SHA process.   [...]

304 Linwood Rd, Kingseat

,

A client came to Candor³ to have a due diligence carried out on this 12.0ha site. A scheme had been prepared for the land which gave a yield of 77 residential lots. After identifying various opportunities to increase density we reschemed the land and derived a 108 lot Council compliant development. Seeing the benefits of [...]

200 Flat Bush School Rd, Flat Bush

,

Candor³ have carried out the engineering design and consenting works for this development in Flat Bush and will be continuing with the engineering observation, surveying and compliance works. The works involve the upgrade of a section of Flat Bush School Road from a two lane rural road to a four lane urban road with major [...]

218 Flat Bush School Rd, Flat Bush

,

This property had been on the market for many years and numerous contracts had failed to settle. The issue with this 7.2ha property was the large floodplains and extensive stands of native bush that covered the bulk of the property reducing the yield to just 18 lots. Candor³ were introduced to Chimbusco International by a [...]

293, 301 and 315 Flat Bush School Rd, Flat Bush

, ,

Candor³ were asked to carry out the consultancy work for these three adjacent blocks of land in Flat Bush. Three consultants had completed schemes prior to our involvement however none delivered either the yield or commercially viable construction methodologies / costs to make the project a success. Candor3 reschemed the block increasing yield by approximately [...]

36, 38 Dyke Rd, Kingseat

,

This project borders 304 Linwood Road and was purchased by another of our valued clients. Working with the developer of 304 Linwood Road there are various economies that can be realized, sharing the cost of a wastewater treatment plant and balancing earthworks across both projects being but two examples. A number of scheme iterations for [...]

125 Murphys Rd, Flat Bush

,

Candor³ have recently picked up the commission to develop this property into approximately 250 dwellings. Transpower have three high voltage powerlines traversing the site and as a risk mitigation strategy Candor³ have already lodged a consent to break the land down into four large lots, two of which are affected by the transmission lines and [...]

46 Belmont Rd, Pukekohe

, ,

Candor³ have carried out all of the engineering design, management and survey for this 163 lot development in Pukekohe. Design work and consenting commenced in early 2016 with physical works commencing in January 2017. Investigations identified a rock layer approximately 2m below the surface and the design has been carried out so as to [...]

35 – 45 Hayfield Way, Karaka

,

Comprising 86 and 34 lots respectively these adjacent developments lie on the north side of the Hingaia peninsula. Candor3 have completed the design and lodged for resource consent in November 2016. Subject to receiving the consent and resolution of some global infrastructure issues the works will proceed to construction in 2017. [...]

198 Mahia Rd, Manurewa

, ,

This 67 lot affordable housing development in Manurewa sits on the shores of the upper Manukau Harbour. Construction commenced in November 2016 and is programmed to be complete by April 2017. Candor3 have carried out all of the engineering design and surveying works for the project and are overseeing construction throughout the build. [...]

Sunderland Precinct, Hobsonville

, ,

Candor3 are carrying out the engineering and surveying for this 4.3 integrated development comprising numerous houses, terraced houses and 9 apartment buildings up to 13 floors in height. Consent has been lodged for the initial stage of the development to establish necessary core infrastructure with construction to commence in 2017. With a tremendous location perched [...]

188 Jutland Rd, Pukekohe

, ,

Candor3 have carried out all of the engineering design, management and survey for this 78 lot development in Pukekohe. Design work and consenting commenced in early 2015 with physical works commencing in January 2016. Just prior to the issue of the consent Watercare altered the wastewater discharge point and required a pump station to divert [...]

73 Belmont Road, Pukekohe

, ,

Candor3 have carried out all of the engineering design, management and survey for this 174 lot development in Pukekohe. Design work and consenting commenced in mid 2015 with physical works commencing in February 2016. Stage 1 is now complete and the s224c should issue in January 2017. Stages 2, 3 and 4 are proceeding through [...]

15 Scott Road, Hobsonville

, ,

This 330 lot subdivision is a real success story. Not being a part of the group that lodged the SHA application our client had to wait until the zoning became operative for Resource Consent to be processed. Working collaboratively with Council allowed us to advance processing such that Resource consent was issued shortly after zoning. [...]

39 Flat Bush School Rd, Flat Bush

, ,

With stages 1 and 2 comprising 200 residential lots having been completed in December 2016 and stages 3 and 4 construction well advanced this development has come a long way since its inception in 2014. With 69 terraced houses scheduled for construction adjacent to Sir Barry Curtis Park in 2017 and a further 129 lots [...]