Market Cove, Favona

, , ,

Candor³ are excited to be a part of the team delivering the innovative Market Cove development in Favona, South Auckland. With circa 1200 apartments and terraced houses to be constructed this is a significant project aimed at providing a mix of much needed affordable housing in Auckland. Sited on the foreshore of the Manukau Harbour [...]

246 Victoria Street West, Pukekohe

, ,

A 75 lot subdivision in Pukekohe. The original structure plan for the block delivered approximately 69 lots. With Council’s agreement, modifications to the planned structure delivered an additional 6 lots. Candor³ completed all engineering design and observation together with surveying works and compliance through Council. Similar Projects

Highgate Business Park

,

Previous design work carried out for this project resulted in an earthworks imbalance of 200,000m3 that the existing consultants were struggling to resolve. Candor3 were asked to review work to date and determine if a solution was available. The commercial component of the project was quickly resolved and a consent lodged to allow earthworks to [...]

333 Ormiston Rd, Flat Bush

Purpose: Legalisation Survey This survey plan defined an area of legal road that had become redundant during the realignment of Ormiston Road. Sound advice, strong communication skills and comprehensive knowledge of the statutory road stopping process enabled our client to purchase this land from Auckland Transport. Our qualified surveyors added value to the project through [...]

178 Point View Drive, East Tamaki Heights

, ,

Intersection Properties successfully had this property approved as an SHA after significant work to convince Council that with controlled landscape amenity a development could adequately deal with a visually sensitive ridgeline dominating the property. Initial schemes prepared as a part of the SHA process did not manage the steep contour well and Candor³'s first involvement [...]

248 Porchester Rd, Takanini

Purpose: Post Development Settlement Monitoring The Resource Consent for this residential development requires our client to undertake a post development settlement monitoring programme for the five years following project completion. The stringent tolerances required of this monitoring requires careful selection of monitoring sites, collaboration with the client’s geotechnical representative and field surveying with utmost precision. [...]

Norwood Drive, Flat Bush

, , , ,

A 29 lot integrated housing development in Flat Bush. Working on behalf of our client and in conjunction with Paul Brown Architects, Candor³ carried out the planning, surveying and engineering for this development. Working collaboratively with Council it was possible to arrive at an outcome that successfully met the needs of all stakeholders and sets [...]

Northcote Shopping Centre

Purpose: Topographic Survey Detailed, reliable topographic survey information forms the building blocks for all engineering and architectural projects. A topographic survey establishes what is onsite, where it’s located and quantifies it. Reliable topographic survey information is critical to establish design constraints for our Engineering Team and external architects to make informed design decisions. [...]

15 Tuhaere St, Orakei

Purpose: Boundary Redefinition Knowing the exact extent of land ownership is critical to the redevelopment of any property. Our team of qualified surveyors search through historic land records and interpret them to calculate and demarcate property boundaries. We take the time to understand client objectives and work alongside them to achieve these with a collaborative, [...]

125 Murphys Rd, Flat Bush

Purpose: Rural LT Subdivision & Removal of Title Limitations This five lot rural subdivision and removal of title limitations included an extensive investigation into historic land records dating back 100+ years, undertaking the survey of adjoining property occupation and defining a natural stream boundary. Successfully completing this subdivision facilitated land dealings and paved the way [...]

293, 301 and 315 Flat Bush School Rd, Flat Bush

, ,

Candor³ were asked to carry out the consultancy work for these three adjacent blocks of land in Flat Bush. Three consultants had completed schemes prior to our involvement however none delivered either the yield or commercially viable construction methodologies / costs to make the project a success. Candor3 reschemed the block increasing yield by approximately [...]

46 Belmont Rd, Pukekohe

, ,

Candor³ have carried out all of the engineering design, management and survey for this 163 lot development in Pukekohe. Investigations identified a rock layer approximately 2m below the surface and the design has been carried out so as to minimize intrusion into this rock layer with it’s likely associated cost. [...]

Sunderland Precinct, Hobsonville

, ,

Candor³ is carrying out the engineering and surveying for this 4.3 hectare integrated development, comprising numerous houses, terraced houses and 9 apartment buildings up to 13 floors in height. With a tremendous location perched above the upper Waitemata Harbour this is an exciting project to be a part of and we look forward to carrying [...]

188 Jutland Rd, Pukekohe

, ,

Candor³ have carried out all of the engineering design, management and survey for this 78 lot development in Pukekohe. A consent was negotiated with Council without a wastewater discharge so as to allow construction of the pump station. The pump station and rising main were consented separately and built to a different timeline. The project [...]

15 Scott Road, Hobsonville

, ,

A 330 lot staged subdivision. Not being a part of the group that lodged the SHA application our client had to wait until the zoning became operative for Resource Consent to be processed. Working collaboratively with Council the Resource consent was issued shortly after the zoning change. Construction started in November and despite a wet [...]

39 Flat Bush School Rd, Flat Bush

, ,

With stages 1 and 2 comprising 200 residential lots having been completed in December 2016 and stages 3 and 4 construction well advanced this development has come a long way since its inception in 2014. With 69 terraced houses scheduled for construction adjacent to Sir Barry Curtis Park in 2017 and a further 129 lots [...]

Load More Posts